SURVEY LEAST SQUARES CALCULATION
Project: abo-da3jan2222
Input File: C:\CIVIL 3D PROJECTS\ABO-DA3JAN2222\TRAVERS\TT.LSI

Total # of Unknown Points: 4
Total # of Points        : 8
Total # of Observations  : 11
Degrees of Freedom       : 3
Confidence Level      : 95%
Number  of Iterations    : 2
Chi Square Value         : 55.63073
Goodness of Fit Test     : Fails at the 5% Level

Standard Deviation of Unit Weight: 4.30623



************************************************************************
                          OBSERVATIONS
************************************************************************

 Type  Pnt1  Pnt2  Pnt3    Measured      StdDev     Adjusted      Resid
 ____ _____ _____ _____  _____________   ______  _____________   ______
 DIST   200     1             396.3360    0.003       396.3314  -0.0046 
  ANG   100   200     1 201-20-23.7000   21.800 201-20-20.9966    -2.70 
 DIST     1     2             166.7055    0.003       166.7009  -0.0046 
  ANG   200     1     2 158-03-07.5000    6.700 158-02-50.4674   -17.03 
 DIST     4   300             390.9700    0.003       390.9651  -0.0049 
  ANG     3     4   300 198-14-20.0000    4.200 198-14-35.3707    15.37*
 DIST     3     4             431.9480    0.003       431.9431  -0.0049 
  ANG     2     3     4 219-25-08.8000    3.600 219-25-18.1068     9.31 
  ANG     4   300   400 238-41-58.0000    5.200 238-42-16.9826    18.98*
 DIST     2     3             599.1075    0.003       599.1040  -0.0035 
  ANG     1     2     3 132-01-47.5000    5.900 132-01-34.2051   -13.29 




************************************************************************
                         ADJUSTED  COORDINATES
************************************************************************

               Std Deviations are at 95% Confidence Level

 Point       Northing           Easting        StdDevNth     StdDevEst
 ______     _____________     _____________     _________     _________
      1       106949.2942       157324.9063     0.1567340298     0.0580820137
      2       106916.4043       157161.4822     0.1806617216     0.0718311495
      3       106400.9814       156856.0894     0.1762782559     0.0751132858
      4       106253.7358       156450.0185     0.1184846856     0.0564300196




************************************************************************
                 2D LEAST SQUARES ERROR ANALYSIS
************************************************************************

                  Semi-Axes are at 95% Confidence Level

 Point     Semi-Major Axis     Semi-Minor Axis     NE-Axis Azimuth
 ______     _______________     _______________     ____________
      1        0.1575775082        0.0557569850        6-20-16.3
      2        0.1806660920        0.0718224088      179-33-16.0
      3        0.1768026984        0.0738764755      175-08-57.3
      4        0.1184890560        0.0564256492      179-37-29.1








************************************************************************
                     Blunder Detection/Analysis
************************************************************************

                                                        Reliability Tests
Type Pnt1  Pnt2  Pnt3     Adjusted     Resid   Redun Estimate  Marg Ext
____ _____ _____ _____ ______________ ________ _____ _________ ____ ____
DIST   200     1              396.331   -0.005 0.052     0.088    P    P
 ANG   100   200     1 201-20-20.9966   -2.703 0.960     2.815    P    P
DIST     1     2              166.701   -0.005 0.064     0.072    P    P
 ANG   200     1     2 158-02-50.4674  -17.033 0.348    48.917    P    P
DIST     4   300              390.965   -0.005 0.063     0.077    P    P
 ANG     3     4   300 198-14-35.3707   15.371 0.304   -50.580    P    P
DIST     3     4              431.943   -0.005 0.070     0.069    P    P
 ANG     2     3     4 219-25-18.1068    9.307 0.139   -66.788    P    P
 ANG     4   300   400 238-42-16.9826   18.983 0.592   -32.058    P    F
DIST     2     3              599.104   -0.004 0.048     0.074    P    P
 ANG     1     2     3 132-01-34.2051  -13.295 0.359    37.026    P    P


 Redundancy is the observation's contribution to the degree of freedom.
 (From 0 to 1 with 1 being best)
 Estimate is used to estimate the blunder which might cause large residuals.
 Marg is a reliability test for a single blunder (Type II error).
 Ext is an external reliability test for an observation
 P = PASS  FAIL = FAIL